Answer / virsen bhosale

1m3= size of bricks =190mm×90mm×90mm & motar joint 10mm =200mm×100mm×100mm=0.002m3
1m3 =(1/0.002)
=500 bricks

Is This Answer Correct ?    1 Yes 0 No

How can calculate the number of bricks.....? Give me answer hurry uppppppppp..

Answer / sharique fattah

joint thickness(10mm) between the side MUST also be considered
go to following link for a clear idea..
(Why so many bricks ??? | Construction basics re-told
https://constructionqueries.wordpress.com/2014/12/04/why-so-many-bricks/)

Is This Answer Correct ?    0 Yes 0 No

How can calculate the number of bricks.....? Give me answer hurry uppppppppp..

Answer / ghufran

1.Length x Width x Height x 13.5 = Ans ( 1 Cft is equal to 13.50 Bricks, its a standard value)
2. Length x Width x Height/Volume of 1 brick or block etc = Ans
A simple calculations.

Is This Answer Correct ?    0 Yes 0 No

How can calculate the number of bricks.....? Give me answer hurry uppppppppp..

Answer / mahesh pawar

Simply we have to divide the size of brick with the volume 1m3
Example,

size of bricks: 19*9*9 in cm
0.19*0.09*0.09 in mm
so the no.of bricks would be,
1/(0.19*0.09*0.09) = 649.77 no.s

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

how i get all type of short type question answer about civil engg

0 Answers  


whatis the banafit of water leak detection and repair?

2 Answers  


calculate 1-2-4 ration concrete - cement - sand metal and water required for 1 cum

4 Answers   Gresp, L&T,


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

0 Answers  


Which is the best book for building construction?

0 Answers  






What is the approx construction cost of 1 lac Sq.ft ..in any place city or town?

2 Answers  


How to calculate cement required for m20,m5 grade

8 Answers   MSEB,


what is the strength [final]of grade m 15 to m 45

2 Answers  


one litre of shuttering oil how much area covered the shuttering?

5 Answers   UltraTech,


how much cement and sand required for 1cum rr masonry

0 Answers  


How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3

5 Answers  


In a given rcc design, how to calculate quantity of steel, for all practical purpose of construction?

9 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)