1m3= size of bricks =190mm×90mm×90mm & motar joint 10mm =200mm×100mm×100mm=0.002m3
1m3 =(1/0.002)
=500 bricks
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / sharique fattah
joint thickness(10mm) between the side MUST also be considered
go to following link for a clear idea..
(Why so many bricks ??? | Construction basics re-told
https://constructionqueries.wordpress.com/2014/12/04/why-so-many-bricks/)
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ghufran
1.Length x Width x Height x 13.5 = Ans ( 1 Cft is equal to 13.50 Bricks, its a standard value)
2. Length x Width x Height/Volume of 1 brick or block etc = Ans
A simple calculations.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahesh pawar
Simply we have to divide the size of brick with the volume 1m3
Example,
size of bricks: 19*9*9 in cm
0.19*0.09*0.09 in mm
so the no.of bricks would be,
1/(0.19*0.09*0.09) = 649.77 no.s
| Is This Answer Correct ? | 0 Yes | 3 No |
can i place column steel lapping in floor beam? my lapping is 24 inches in floor beam and 24 inches on floor beam
I s code of steel
what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?
Quantity of cement in kgs for different proportions and different thickness in plastering work per 1 sq.m. And how to estimate this quantities.
2 Answers Al-Jaber, IVRCL, L&T,
what is the maximum number of course that can be laid according to IS code and the max height.
OPC 43 OR PPC for rcc structures(raft foundation,column etc)? For M20,,which cement is better and why? for a residential structure (3 storey plus basement)
What is the exact meaning for under & over reinforced beams & when they have to used..
11 Answers Gammon, L&T, MEIL,
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
what is tensile strength?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)