i want to measure voltage difference between neutral and
earth so i just simply use voltmeter.
my question is that may i use this measure continuosly.or
there are some electricity board restrication on that? or it
creat some problem on my measuring device..?
Answers were Sorted based on User's Feedback
You can measure after the metering . Do not use service wire
or meter terminal
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / harshid
Is there any method for voltage measurment for continuosly monitoring on neutral to earth voltage...?
I want to check quality of earthing by measuring this voltage.
If any other idea you have...
Other than earthing reaistance.
Beacause my resistance m/s depend on how electricity board earth ther syatem
Means solid earthing or etc....
Is This Answer Correct ? | 1 Yes | 1 No |
what does work of electrical technician in industrial
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
What is difference b/w Microwave and OPGW ??
how to write program by ladder logic in case of PLC operation
How to calculate the Meter constant for the given Meter (by using any formula)
i need 24v dc from 230v ac supply how we can getit ? what are the devices &its rating requied for that ? plzz i need answer urgently .thank u
Explain thin film resistors and wire-wound resistors
why only dc is given as excitation...why not ac???
how does commutator convert a.c to d.c?
0 Answers NRSC National Remote Sensing Centre, RBC,
What the capacitor Current formula?, For 1 KVAr how amps its required? for using the KVAr for boosting the PF Design Calculation.( Eg: for 30 KVAr required how many KW?)
17 Answers Alstom, Call Centre, EDC, HCL, Procon Engineers,
what will happen if i connect or change line with phase terminal
how do we calculate length of starting time and repeated starting of a direct online starter?