Answer / shakeel akhtar

35.314

Is This Answer Correct ?    19 Yes 4 No

1m3 of brick is equal to how many cft of brick ..

Answer / ambarish

Its 35.28 Cft.

Is This Answer Correct ?    8 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / er md sabbir

35.31 cft
because 1cum=35.31 cft

Is This Answer Correct ?    3 Yes 0 No

1m3 of brick is equal to how many cft of brick ..

Answer / parthapratimmid@yahoo.com

35.315

Is This Answer Correct ?    1 Yes 0 No

1m3 of brick is equal to how many cft of brick ..

Answer / deepchand

35.38

Is This Answer Correct ?    1 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / adnan

35.323

Is This Answer Correct ?    0 Yes 1 No

1m3 of brick is equal to how many cft of brick ..

Answer / guest

35.29 cft

Is This Answer Correct ?    0 Yes 2 No

1m3 of brick is equal to how many cft of brick ..

Answer / jk

35.51 cft

Is This Answer Correct ?    2 Yes 7 No

1m3 of brick is equal to how many cft of brick ..

Answer / g.a.naidu

10.765 cft

Is This Answer Correct ?    1 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate the quantity of plaster.

3 Answers   DB Realty,


I'm constructing my house, now at lintel level. I need belt concrete with laft..length - 22ft, berth- 11ft, one side laft for 2ft, *22ft length. Kindly inform me centring cost only, without material cost.

0 Answers  


what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.

2 Answers   TATA, Vastu Kirti Enterprises,


Thumb rules for 1.brickwork & Blockwork 2.Plastering 3.FLooring and tiles 4.Shuttering 5.Steel

1 Answers   Sumadhura Infracon,


what"s the formula to find the cement,sand,aggreegate(45mm) requirement for PCC?

5 Answers   L&T, Radiant Fire,






What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited

1 Answers   HPSSSB,


for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how

1 Answers  


How to find out slope footing concrete

0 Answers   Ekta World, Punj Lloyd Ltd,


What is the strength of 150x150mm cube compared to 300x300mm concrete cube?? Why?

4 Answers   JP Group,


From where the relationship of target strength comes in mix design(graph)

1 Answers  


What is the Roll of Water Bonding under VDF road?

0 Answers  


which is cost effective Steel Structural or Concrete Structure building?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)