1m3 of brick is equal to how many cft of brick
Post New Answer View All Answers
psc girder detail
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
significance of specific surface area of particles?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is OSHA compliance?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
what is the productivity in aluminium shuttering per day
Explain major differences between routing maintenance and major maintenance.
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
calculate the quantity of water for 1:6 cement mortar
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
How many cum of 9.5mm stone in 1 ton ?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
what is the permanent solution applied for restoration of leaning tower of pisa?