for preparing 10cum of 1:4:8 cement concrete the
requirement of sand is
0.7cum
2.8cum
4.74cum
18.40cum
& how
Answer / engr.asad ali
we know that
Total wet volume of concrete = 10Cu.m
First we find dry volume
Dry volume = wet volume X 1.54
Dry volume = 10 X 1.54 = 15.4Cu.m
Determine sum of ratio = 1+4+8 = 13
And also we know that
Quantity of Sand = ration of sand X wet volume
-------------------------------
Sum of ratio
Quantity of sand = 4 X 15.4
-----------
13
Quantity of Sand = 4.738 Cu.m say 4.74Cu.m
| Is This Answer Correct ? | 71 Yes | 4 No |
What is the diff between cad & cadd?
What is the tensile strength of wood?
why cutting length in design of beam is rounded more for -r/f & less for for +r/f
How to estimate quantity of paint in 1M3
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
how must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.
17 Answers CCCL, Gulf Construction, KITECH, L&T, Mars Planning Engineering Services, NHAI, Simplex, Supertech, Yamaha,
What is the maximum cement content allowed in RCC?
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What is the slope of vertical wall ? quick ans
Reinforcement details at hinged joint
how can we calculate the quantity of cement, sand, aggregate in any concrete mix
mix design of concrete using indian standard methods
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)