What is the full form of BHEL?
A) Bharat hydroelectricity Limited
B) Bharat Heavy Electronics Limited
C) Bharat Heavy Electricals Limited
D) Bharat Heavy Enterprises Limited
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
From where the relationship of target strength comes in mix design(graph)
how to design mix ratio for concrete using M25?
Hi Dudes, I have completed B.E Civil with two years experience in Highway& Bridges. One year experience in Site field & One year experience in Planning & Billing Dept. I am willing to work in abroad, i am having passport and all..So if anybody knows about foreign vacancy pls inform me..Ph:9994050979 & Mail Id: Simacivil1988@gmail.com
How can effect the Floor tiles if water absorption value is higher than 0.5%?
what is the ration of the dummy columns which are to be dismantled in reconstruction for laying original columns
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
What is meant by Friction Pile?
How much is anchor length ?
what is construction joint? why do we give expancion joint in building?
how many brick in 1 cubic meter with mortar ?
what are co-efficient for jacks, acro spans and runners for slabs per sft?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)