Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to calculate the quantity of plaster.

Answers were Sorted based on User's Feedback



how to calculate the quantity of plaster...

Answer / manoj kumar bhola

Quantity of plaser for 12 mm thickness of ratio 1:6 say for 100 sqmt then ,the value 2 takes for total dry volume(cum)
2/1+6 =0.29 cum(8.28 bags)cement=4.14 kg/sqm
=0.29 * 6 =(1.74 cum)sand
similarly for Quantity of plaser for 20 mm thickness of ratio 1:6 say for 100 sqmt then ,the value 3 takes for total dry volume(cum)
3/1+6 =0.43 cum(12.29 bags)cement=6.15 kg/sqm
=0.43 * 6 =(2.58 cum)sand

Is This Answer Correct ?    4 Yes 1 No

how to calculate the quantity of plaster...

Answer / ashis malakar

area x thickness of plaster = total quantity of plastering.
1m3 plaster = 2200 kg (weight of plaster)
taking proportion of cement and sand ,calculate the quantity
of materials .

Is This Answer Correct ?    1 Yes 2 No

how to calculate the quantity of plaster...

Answer / arul

c.m 1:6 = 1440/6 = 240kg cement & 0.3 cum of sand

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

1 Cubic Meter = 487 Modular Brick, 1 Cubic Meter = 494 Non Modular Brick, (As per Rate Analysis DSR 2012 Vol.-1)what is the Brick Size ? 1 Cubic Feet = 13 Modular Brick, 1 Cubic Feet = 17 Non Modular Brick. what is the Brick Size ?

2 Answers   ABR Constructions,


How to hide dimensions in autocad?

0 Answers  


Cube tests of concrete are failed at 7 days and 28 days.What is your next action?

8 Answers   AppLabs, Parsvnath,


Why Is Propping Required For Long Structures Once The Form Work Is Removed?

0 Answers   Bechtel,


what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?

0 Answers  


What is the ratio of M40 Concrete?

1 Answers  


What is need for setting limits?

0 Answers  


how material can be calculate for brick work in 1:6

3 Answers   L&T,


How to Calculate steel

9 Answers  


How much bricks, cement

1 Answers   BCCL, Reverie,


Mention what are the composition of a landfill?

0 Answers  


what is the grade of concrete?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)