what we do if excavation is more than actual requirement
Answers were Sorted based on User's Feedback
Answer / raj
if excavation is more than the actual requirement , then we have to use filling upto the level which we have to originally excavate . the filling maybe sand filling or pcc filling
Is This Answer Correct ? | 5 Yes | 2 No |
Answer / sankardas banerjee
For secure a farmed base of the load bearing member by filling sand which is concentrated towards the compaction of base.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sjtbehera
Filiing excess earth and obtained required soil bearing capacity is very timespending.best is construct in to orginal level
Is This Answer Correct ? | 2 Yes | 1 No |
Answer / pankaj kumar priyadarsh
if space is available we compete the soil is layer wise as specified in IS stander & taste soil density test if test is 95 t0 97 % than we can do the pcc for structural
Is This Answer Correct ? | 2 Yes | 1 No |
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
WHAT ARE TYPES OF STRUCTURES
How to find weight of 1cu.m concrete in varies grades? and giive calculation.
what is the basic difference between Coloumn & Shear Wall
How to provide spacer bar in barbending work,parallel to bar or inclined to bar? What is the reason?
Advantage of Aluminum form work in terms of activities can be skip and cost too
in a building what is the thickness of a wall in metres? dafault wall value?
what is quantity of sand required to plaster wall about 1000 sq ft
Why the statue of liberty is made of copper?
how many shuttering material required for 1000 sq.m built up area.
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
If a 20 years old building without columns was going to renovation having a thickness of walls 12" is it Withstand the load of a new structure of having load of 1150k.g including live&dead loads?
1 Answers Construction, Ryna Facilities Services,