what we do if excavation is more than actual requirement
Answer Posted / raj
if excavation is more than the actual requirement , then we have to use filling upto the level which we have to originally excavate . the filling maybe sand filling or pcc filling
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
What is the purpose of Chipping in the heavy foundation?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
what is the dimensions of river sand truck trailer or trolly ?
What is the substitute of Mastic Asphalt?
Define a polyline?
How much time Required for PPR pipe network testing
What is construction mitigation management?
Doul Bar reinforcement and details of drawing.
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
what are RIB slabs explain about it
how to conversation of all construction material in to brass
What are the advantages of cad software’s?
load combinations how many types for staad design purpose?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
what is called Bulk Density of aggregate?