what we do if excavation is more than actual requirement
Answer Posted / raj
if excavation is more than the actual requirement , then we have to use filling upto the level which we have to originally excavate . the filling maybe sand filling or pcc filling
| Is This Answer Correct ? | 5 Yes | 2 No |
Post New Answer View All Answers
how to calculate load bearing column
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
How many are the types of joints?
What is absolute coordinates?
what is the difference between natural draught cooling tower and induced draught cooling tower
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
Why you are leaving present job?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
what are the types of design? which type of method is used at what type of design & why?
150mm bricks size how many use 4.14 m3
please, what is the required bar for a column of 6mx6m the dept is 405mmx300mm,its an axially loaded ?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.