what we do if excavation is more than actual requirement
Answer Posted / pankaj kumar priyadarsh
if space is available we compete the soil is layer wise as specified in IS stander & taste soil density test if test is 95 t0 97 % than we can do the pcc for structural
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What do we mean by partial moment release ??
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
HOE TO YOU PLAN TO ACCHIEVE THE GOALS?
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
Define Who designed the city of Washington DC?
What out turn civil works
3. What are the disadvantages of your present job, things you do not like about it?
how to find quantity of concrete in PCC M15
What is the diameter of the 3"inch nails?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
i want texture painting pwd data
what are the proper pipes for salt water line
Which is the latest version of solidsworks?
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
How do you convert wind speed into force?