what we do if excavation is more than actual requirement
Answer Posted / pankaj kumar priyadarsh
if space is available we compete the soil is layer wise as specified in IS stander & taste soil density test if test is 95 t0 97 % than we can do the pcc for structural
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
which steel is better for residential building tmt steel or hysd steel
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
what is the minimum cement content for M20 & M25 as per is code -456(2000).
Define What is unit weight of normal concrete?
what is the use of beam end forces while using a staad ? wha they are show
how we check the thickness and line of ceiling plaster.
Why the statue of liberty is made of copper?
How to calculate Volume of Wet cement concrete for a specific grade?
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
What is the purpose of Chipping in the heavy foundation?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is the strength of 1:6:12 mix?
How to calculate volume of concrete & steel on tank foundation & ring wall ?