what we do if excavation is more than actual requirement

Answer Posted / ssk

we r use plumb concrete 60% plums 40% m15 concrete

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to design and calculate materail quantity for concrete speedbreaker ?

5382


Basic questions of civil engineering

1620


types of laps in column

1918


what is the clear cover for shearwall?

1062


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2343






column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial

3494


Why the finite element method is lower bound solution?

2309


What are the alternate material for steel, Sand and aggregate

1834


what is the mix design for M:60 with micro silica andmetakaoline?

1808


what does the track parameter mean in staad.pro?

5462


For what purpose bedding is used under storm water drains?

667


Which architectural movement is also known as jazz moderna?

840


How do we calculate absolute pressure?

775


What is type failure of road surface? how to repair the failure of road surface?

1979


what is the steel difference between np-2 and np-3 pipes and weight also

1685