what we do if excavation is more than actual requirement
Answer Posted / ssk
we r use plumb concrete 60% plums 40% m15 concrete
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
If specific gravity of cement is less than 3.15 what is the cause?
what is the criteria for the finalisation of pavement thickness in road project?
what is the water cement ratio for plastering
How to come 1.54 from dry to wet concrete?
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What is the difference between undo & redo?
what is civil engineer greatest strength and weakness?
What is the basic difference between OPC
rimmer in pile foundation
What is Rankine Cycle?
How we calculate the service time of buildings
What is rolling stock
Formula of mid span bar
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing