what we do if excavation is more than actual requirement
Answer Posted / lavanya
We can adjust it according to it
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is need for setting limits?
What is the average density of soil?
How to calculate woden area in sft and Cft
What are the joints wants to made in masonry where door opening, arches like etc..
What is the Maximum %age of Steel in columns and beams ?
How many cement sand ballast in cc 1:4:8 40mm
WHAT IS YOUR EXPECTED SALARY?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
Discuss some applications of modular elasticity?
acceptance criteria for concrete works
What is the difference between linear dimension and aligned dimension?
Basic civil interview questionsÂ
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.