what we do if excavation is more than actual requirement
Answer Posted / lavanya
We can adjust it according to it
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
why the profile of shell of natural draught cooling tower is hyperabolic.
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
What are the alternate material for steel, Sand and aggregate
What is chemical composion test
Trapezoidal section footing calculation of Volume & its Area
what post do you prefer to work in this company and why do you think you can serve better in such position?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
How you can use different dimension tools in cad? What are the different dimensions available?
why development length = 50D . why not 100D
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
What is the largest concrete dam in the world?