what we do if excavation is more than actual requirement
Answer Posted / sjtbehera
Filiing excess earth and obtained required soil bearing capacity is very timespending.best is construct in to orginal level
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
it is a corrected question." make a list of engineering property(properties) of soil.
What Are The Different Type Of Slump Test Indications?
How do you calculate the power of a centrifugal pump?
What is the difference between a wood shake and wood shingles?
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
pls give me some basic informations in construction of a structure?
Can we use the flyash bricks in brick bat coba?
what is diffrence between catchment area,watershed and basin?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
What is the difference between Hinged and pinned in Column ends
What is the tensile strength of wood?
Does brick grows bigger every year?
How did the romans get water up hills using aqua ducts?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?