what we do if excavation is more than actual requirement
Answer Posted / sjtbehera
Filiing excess earth and obtained required soil bearing capacity is very timespending.best is construct in to orginal level
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
how to calculate the steel in 500yard
What are the causes of building collapse?
How to find CN by using arcgis 9.3?
what pressure the NP2 class RCC pipe can sustain?
what is escalation?how it is done?
in plate load test what is the thickness of plate 20mm 5mm 50mm none
What is the force exerted by the tacoma narrows bridge?
Spider cracks occur in beam bottom due to––
Why should you consider yourself fit to be hired by jindal steel.
Would you cause a 55-gallon drum of water to weigh more by climbing in?
what is the breaking strength of wall tiles
Why concrete barriers have curved surface profiles?
Difference between pre-tensioning and post-tensioning.
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.