what we do if excavation is more than actual requirement
Answer Posted / sankardas banerjee
For secure a farmed base of the load bearing member by filling sand which is concentrated towards the compaction of base.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
How do we test on design and style in a software?
how to calculate testing date
Explain the Strength of brick?
sir, whitch is the best book (writer name) for prepration of gate....
What are the materials used in building a gravity dam?
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How is calculate the cube molt
what are the values of compressieve strenght?
What is critical path method (c.p.m)?
what pressure the NP2 class RCC pipe can sustain?
Explain what are the phases inspections are done by local authority while construction?
How many mortar required for Brickwork of 1 Cu.m works??
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?