how we can calaculate cutting lengh for stiruups 6mm dia .
column size 20 cm x 30 cm, cover 20mm
Answers were Sorted based on User's Feedback
Answer / rakesh kumar
200mm
300mm
200-20= 180
300-20= 280
Stirrups=2(l+b+12D)
2 (180+280+12*6)
2 (532)
Length of stirrups= 1044mm.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / aabid
(160+160 + 260+260)+ extra hook 50+50 - 2d *5time 60
840+100-60 =880 cutting length
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chinnasamy
20CM X 30CM
200MM X 300MM
DEDECT COVER
200-20-20=160MM
300-20-20=260MM
HOOK LENGTH=10D
HOOK LENGTH=10X6
=60MM
DEDECT ELOCTION=2DX5CORNER
=2X6X5
=60MM
CUTTING LENGTH=(160+160+260+260)+60-60
=840MM
| Is This Answer Correct ? | 3 Yes | 5 No |
Answer / usman ali
128.88cm is the correct answer
in total length must add 2 numbers of hucks 15.24cm+15.24cm
so the corrrect answer is 128.88cm
| Is This Answer Correct ? | 1 Yes | 4 No |
Answer / naresh
if columns is 20x30cm
convert 1 cm=10mm
so 20cmx10=200mm
same 30x10=300mm
than
200-40=160 cover block
300-40=260 cover block
=(160+260+10d)*-2d
=(160+260+60)*-60
=900mm
i.e. 90cm (if cover block use in face of stiruups)
or if cover block are using with face of vertical bar of columns stiruups cutting length should be
(160+260+60+10)*2-60=920MM ie 92cm
| Is This Answer Correct ? | 1 Yes | 4 No |
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
what is the MSL?where is it located?
2 Answers C-Tech RC Design, Era Infra Engineering, IVRCL,
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
wat is the size of fine aggregate & coarse aggregate?
what is diffreant types of water proofing chemical tell me please
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Characteristics of a model project are ––
convert= kg into brass
In interview,if they ask what are your achievements in your career?how to answer this question?
2 Answers GMR, Taehwa Enterprises,
What is the actual formula to calculate dry consumption of 1cubic meter m20 Concrete???? Plzz tell seniors it is urgent..
As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
What is the compressive strength of fly ash bricks?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)