how we can calaculate cutting lengh for stiruups 6mm dia .
column size 20 cm x 30 cm, cover 20mm
Answer Posted / santo.m.f
103.20 cm
| Is This Answer Correct ? | 7 Yes | 11 No |
Post New Answer View All Answers
How to design staircase.plz tell me formula for the design the staircase.
3. What are the disadvantages of your present job, things you do not like about it?
How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
What is meant by a context menu in a cad software?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
material used for mendrel use to bend epoxy coated rebar
How to cal. The weight of hollow pipe?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
What is the diameter of the 3"inch nails?
Types of column foundation and how to calculate its steel quantity.
what are the types of dimensioning?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.