Characteristics of a model project are ––
Answer / sjtbehera
1. Good enviornment
2. Good planning
3 good resources
4. Good cordination.
| Is This Answer Correct ? | 1 Yes | 0 No |
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
how to calculate estimation for puttey... give me an example
what is compressive strength of concrete?
detailed calculation of the amount of cement used?
What is hybrid foundation?
cement mortar1:5 12mm thick and one bags cement how much area pleastering please give anwser
12 Answers DeSigns Inc, L&T, Marg, Sand, Vee Technologies,
How can I make justification between using concrete grade c35 compare c37?
can u use instead of water milk for concreting
what would be the rqmnt. of cement and sand (1:6)for building brick wall and also 20mm thick plaster on the wall by same ratio?
What is quantity of Cement and Sand required for the 1 cum brick masonry with 1:6 Ratio cement mortar.
2 Answers RPP Infra Projects, SIL,
Where do we use singly and doubly reinforced beam in construction purposes
2 Answers Isha Homes, Simplex, Sterling Wilson,
what is the technical word for column and beam joint
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)