As per IS 2502 2(A+B)+24d formula is given for stirrups detailing,but explination not given for how that 24d came
Answer / vimal champaneriya
Lenght of the Two hooks 2 X 12D = 24D
| Is This Answer Correct ? | 14 Yes | 4 No |
silt maximum in sand.
why red bricks used for brickbat coba
why will provide chair in slab
What are new methods /technologies of pothole patching?
which percentage is maximum in good quality cement?
Why steel rods are produced only in even dimensions?
What is labor and material payment bond?
brick work 1cum kitne cft hote hai
how to find quantity of total concrete, cement bags and sand. for any ratio
How much steel required for only ground floor of 1600 Sq foot.Having general structure ?
different type of beam
What is the average density of soil?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)