how to check aggregate quantity in stock yard
Answer / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
| Is This Answer Correct ? | 1 Yes | 1 No |
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
who to find building iron rod strenth
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
DEFINATION OF CIVIL ENGINEERING
What Are The Different Type Of Slump Test Indications?
what is the basic difference between Coloumn & Shear Wall
what are the types of bridges
where do Tie beams used in foundations?
what is lap length? why it is required?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
what is main diffrence between vitrified and cremic tile????
2 Answers Colliers International,
is ther any formule for w/c ratio
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)