what is the meaning of laitance
Answers were Sorted based on User's Feedback
Answer / banambar pradhan
in cement conc., if water cement ratio excess in conc. then
during the period of casting , aggregate goes down and
cement slurry goes up. this process is called laitance
Is This Answer Correct ? | 14 Yes | 3 No |
Answer / jagadish
the formation of weak powdery layer on the surface of
hardened concrete due to high water cement ratio is know as
laitance
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pramod kumar, gurgaon
formation of cement paste at the surface of the casted slab
or road after worked up with the trovel. it is due to the
aggregate goes down and water comes up to the top surface
which produces dust in summer and mud in rainy season.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manikanta73
due to over compaction of concrete aggregates goes down and cement and water comes up and forms a layer called laitance
Is This Answer Correct ? | 1 Yes | 1 No |
how to calculate steel for slab or footings?
how to calculate the circular beam reinforcement.its a helipad beam. Dia of bar 25 mm. if its consider any elongation?
Exterior Joints,define
how to identify np3 pipe and np4 pipe
0 Answers NCC, Petron ltd, RCC Laboratories India Private Limited,
what is density on steel bars?
What is the density of steel?
in the construction of residential building what type of tank are used?where?why & what is its purpose?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
in design case of structural member best suitrable percentage of steel limit is what
04. a. Slenderness ratio…………… 1 b. If the height of a stage is 15-0 & dia. of the prop is 5, the slenderness ratio is….… 1 c. If the height of a stage is 10-0 & dia of prop is 3, the number of bracing will be…… 1
What is the wastage % of concrete in Conventional shuttering design & Mivan Shuttering for high rise building.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?