Answer Posted / ratheesh
if you are kept unshapely, you can't take the proper
measurement.
if you are kept Trapezoidal shapely, we can take the correct
quantity. (you may see in Railway stations)
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What are the ingredients of pre-stressed concrete?
Does VDF add strength to the flooring apart from preventing water ingress?
Name the main components of a cad gui?
What is command line?
What does civil engineering mean?
natucher of concrete &type of concrete?
Wats the formula of eccentric footing and how was calculated from concrete qty
pls give me some basic informations in construction of a structure?
How to find beam R/F cutting length
What are the applications of the modulus of elasticity?
How many kilo-newtons equals 1000 kilogram?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What are the uses of alloys in daily life and how are alloys made?
how to prepare site mix design