what is steel consumption for high rise building column,
beam, slab,footing
Answers were Sorted based on User's Feedback
Answer / s.k.roy
Based on experience the Consuption for a Building of 10-15
Storey :
Beams 125-140 Kg per cu.m of Concrete
Slabs 80-100 Kg per cu.m of Concrete
Columns 350-400 kg per cu.m of concrete
Footings100-125 Kg per cu.m
In general for a Eartquake Resistant Str in Zone 3/4 the
steel consumption can vary between 6.5 to 7.5 Kg per
sq.feet of Constructed area
| Is This Answer Correct ? | 29 Yes | 7 No |
The overall consumption up to 20 stories residential
building is around 5.5 kg per sqft.
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / b.sankararaman
Footings generally will have 50 to 80 Kg/Cum. Other
components are fairly accurate
| Is This Answer Correct ? | 9 Yes | 3 No |
Answer / rajesh kumar jha
Column:- 160 kg / cum
Beam :- 110 Kg / cum
Footing :- 80 Kg / cum
Slabe :- 80 Kg / Cum
| Is This Answer Correct ? | 1 Yes | 1 No |
1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work and cc block work and plastering how many m2 per day 2) one carpenter per day how many m2 will do as well as scaffolding how many m3
12 Answers Al-Futtaim, Arihant, GS, Gulf, L&T, NCC, Paras Buildtech, PR Constructions, Ramco,
What is the ring size of column 600x400 (8mm dia ring) ?
Please give a brief description of centre of gravity
what is the advantage and disadvantage of using stone dust as a fine aggregate in concrete?????????
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
What are the reasons for geotechnical site investigations in uganda?
how calculate the ms angle weight formula detail
9 Answers Concor, Puravankara,
Is there any difference in IS 456 and IRC 15?
what is working drawing?why it is use?
pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
25. Are you willing to work overtime?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)