what is steel consumption for high rise building column,
beam, slab,footing

Answers were Sorted based on User's Feedback



what is steel consumption for high rise building column, beam, slab,footing..

Answer / s.k.roy

Based on experience the Consuption for a Building of 10-15
Storey :
Beams 125-140 Kg per cu.m of Concrete
Slabs 80-100 Kg per cu.m of Concrete
Columns 350-400 kg per cu.m of concrete
Footings100-125 Kg per cu.m
In general for a Eartquake Resistant Str in Zone 3/4 the
steel consumption can vary between 6.5 to 7.5 Kg per
sq.feet of Constructed area

Is This Answer Correct ?    29 Yes 7 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / lalit lone

The overall consumption up to 20 stories residential
building is around 5.5 kg per sqft.

Is This Answer Correct ?    9 Yes 1 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / b.sankararaman

Footings generally will have 50 to 80 Kg/Cum. Other
components are fairly accurate

Is This Answer Correct ?    9 Yes 3 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / rajesh kumar jha

Column:- 160 kg / cum
Beam :- 110 Kg / cum
Footing :- 80 Kg / cum
Slabe :- 80 Kg / Cum

Is This Answer Correct ?    1 Yes 1 No

what is steel consumption for high rise building column, beam, slab,footing..

Answer / sachin

100 to 120 kg/cum

Is This Answer Correct ?    3 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

hook and bend length in reinforcement? 

1 Answers   ECCI,


NP3 CLASS HUME RCC PIPE

1 Answers  


what opc & ppc cement $ composition?

1 Answers  


which are the Indian auther books for STONE COLUMN/GRANULAR PILES?

0 Answers  


what is the difference b/w full length and cutting length?

0 Answers   L&T, Simplex,






say the propotions of different concrete mix desidn(M20 M15 M25 M25 M30)

4 Answers   Hayat,


what are the tests to be done for grout material, and procedure for compressive strength test procedure for grout material?

1 Answers  


factor which affects design of concrete mix

4 Answers  


what is the allowable limit of wastage of cement for RMC at plant operated manualy

4 Answers   DLF,


How much cost is required for 1 Flyash Brick?

1 Answers  


what are the differences between opc cement and ppc cement in applications?

4 Answers   NCC,


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)