Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why an ideal voltage source has low internal resistance????



why an ideal voltage source has low internal resistance????..

Answer / bala

ideal voltage source voltage is constant at all loads. so that
it should have low internal resistance to minmise I2r loss due
to current. therfore it has low internal resistance.

Is This Answer Correct ?    1 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

sir please send me iocl written test paper in my e-mail account. i'll be obliged to you........ thank u roshan

0 Answers   IOCL,


I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.

0 Answers   HCL, TCS,


why we use 25 kv in railway .not 11kv, or 33 kv

2 Answers   ISRO,


What is the current carrying capacity of 0SWG,3SWG,10 & 12 SWG solid bare overhead copper conductors?

0 Answers   HAL,


Diagram and details of polarity test for Current Transformer 11kv 400/200/100/1A

0 Answers   Hiranandani,


how to claculate the ups load in KVA pls give the if any fourmoul?

4 Answers  


if 20 hp motor starts directly delta connection.motor what will be the effect.

3 Answers   HP,


What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.

0 Answers  


what do you mean by plant earthing system.

0 Answers  


What are the conditions to be satisfied before connecting two DC generators in parallel?

9 Answers   Bhel, Godrej,


railway exam in asst loco pilot old test paper

25 Answers   Indian Railways, Loco Pilot, RRB, Southern Railways, TATA, Vimal,


how to erect roof control panel?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)