How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answers were Sorted based on User's Feedback
Answer / thiraviam
after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / satishkumar
after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manjunatha.h.s
How many days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
As per codal provision 7days curing by ponding +7 days
continues sprinking should be done, Minimum of 14 days
curing should be done to start casting a new slab upon it
therewhich Back propping should be given to the lower slab
in the column capital portions,
In case if ponding is not done, continues water sprinking
should be done for 21 days
Is This Answer Correct ? | 1 Yes | 1 No |
toothpaste is non-newtonian or newtonian
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
procedure to calulate the how much bag of cement is used for M20 grade?
how to identify np3 pipe and np4 pipe
0 Answers NCC, Petron ltd, RCC Laboratories India Private Limited,
How to do rate analysis for concrete work including shuttering work?
0 Answers DBM, Techno Solutions,
An invisible line should intersect a visible line with
1 Answers PSC, PSCI, SPC Systems,
how can change 12mmdia@150c/c bar spacing to 16mmdia
what is the water-cement ratio of mix design while 30mpa in 7 days?
what are the criterias for designing a school lab? for e.g a chem lab.Does it depend on room size or no. of students?
Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?
Is there any difference in IS 456 and IRC 15?
What does a construction cost covers and what does not?