How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

Answers were Sorted based on User's Feedback



How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / thiraviam

after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure

Is This Answer Correct ?    5 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / irfan

20

Is This Answer Correct ?    5 Yes 4 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / fayaz

27 days

Is This Answer Correct ?    4 Yes 3 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / satishkumar

after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.

Is This Answer Correct ?    1 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / manjunatha.h.s

How many days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?

As per codal provision 7days curing by ponding +7 days
continues sprinking should be done, Minimum of 14 days
curing should be done to start casting a new slab upon it
therewhich Back propping should be given to the lower slab
in the column capital portions,

In case if ponding is not done, continues water sprinking
should be done for 21 days

Is This Answer Correct ?    1 Yes 1 No

How manu days after the casting of a slab another slab can be casted above it? what is the total ..

Answer / dushyant

What about casting in 14 days?

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

toothpaste is non-newtonian or newtonian

1 Answers  


1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.

1 Answers   Gammon,


procedure to calulate the how much bag of cement is used for M20 grade?

5 Answers   L&T, NCC, Sahyog,


how to identify np3 pipe and np4 pipe

0 Answers   NCC, Petron ltd, RCC Laboratories India Private Limited,


How to do rate analysis for concrete work including shuttering work?

0 Answers   DBM, Techno Solutions,






An invisible line should intersect a visible line with

1 Answers   PSC, PSCI, SPC Systems,


how can change 12mmdia@150c/c bar spacing to 16mmdia

2 Answers   Apex,


what is the water-cement ratio of mix design while 30mpa in 7 days?

0 Answers   Google,


what are the criterias for designing a school lab? for e.g a chem lab.Does it depend on room size or no. of students?

3 Answers  


Two way slab, curtailment provided in both side in longside and short side. which side curtailment provided in one way slab?

1 Answers   IBA,


Is there any difference in IS 456 and IRC 15? 

1 Answers  


What does a construction cost covers and what does not?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)