How manu days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
Answers were Sorted based on User's Feedback
Answer / thiraviam
after casting the salb it will take 28 days to cure
in 7 days time it will cure 65% and the rest will take
remaing days to cure
Is This Answer Correct ? | 5 Yes | 1 No |
Answer / satishkumar
after 21 days.if ponding is not then 28 days curing reqd it may depends upon season.
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / manjunatha.h.s
How many days after the casting of a slab another slab can
be casted above it?
what is the total curing time of a slab if ponding is not
done on it?
As per codal provision 7days curing by ponding +7 days
continues sprinking should be done, Minimum of 14 days
curing should be done to start casting a new slab upon it
therewhich Back propping should be given to the lower slab
in the column capital portions,
In case if ponding is not done, continues water sprinking
should be done for 21 days
Is This Answer Correct ? | 1 Yes | 1 No |
How many days should curing of plastering, brick work and concrete
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
what is a civil enggineer ?
Why is concrete cube test carried out?
define prestressing? compare prestressing with post tensioning?
How to find the cuplock pipe qty in staging for Minor bridge?
what does '415' in FE415 stands for??
what are the different types of sizes of bricks?
where is dolpin pile is used
3 Answers IGCAR, Sekar Construction, Soba,
Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.
what is the clear cover for shearwall?
what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???