What is the difference between EPC,DBOOT and BOOT.

Answers were Sorted based on User's Feedback



What is the difference between EPC,DBOOT and BOOT...

Answer / nkn

These are the terms used in contracts, EPC - Engineering ,
Procurement , Construction; BOOT- build Own Operate
Transfer; DBOOT - Design Build Own Operate Transfer.

Is This Answer Correct ?    22 Yes 3 No

What is the difference between EPC,DBOOT and BOOT...

Answer / surya v kuchibhotla

In the EPC system, funds will be provided by the client
based on the client's estimation.The contractor has to
execute the project as per the scope of the client. In the
BOOT, the funds shall be of contractor's and based on
project viability, the contractor can collect fee from the
users for a specified period to get back his funds.
Wherein, the designs will be specified by the client. In
the DBOOT, contactor can do value engineering based on the
scope of the project and can get back his investment as in
the case of BOOT.

Is This Answer Correct ?    15 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?

4 Answers   CDS, HCC, PPL,


B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS

0 Answers   TCE,


what is right & short method of measurement of slab&beam

0 Answers   L&T,


WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER IN A CONCRETE MIX.

3 Answers   FHA, Unitech,


The point of contraflexure occurs in

10 Answers  






whats are the max value of providing of super-elevation in road way in various condition?

1 Answers   IES,


what is density of 20mm coarse aggregate.plz send answer my below adress e.mail

0 Answers   NG Constructions, Quaid-e-Azam International Hospital, Shafiq Constructions,


1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?

2 Answers   HSCL,


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

0 Answers   BPSL,


Which is the direction for positive angle?

0 Answers  


HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.

1 Answers  


Adout concrete

1 Answers   Bhel, TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)