how to calculate the number of cement bags required for 1m3 of work..

Answer / sumair jain

Grade Quantity(bags)

M5 2.83
M7.5 3.48
M10 4.52
M15 6.45
M20 8.22
M25 11.304

Is This Answer Correct ?    0 Yes 0 No

how to calculate the number of cement bags required for 1m3 of work..

Answer / mujtaba

In 1 m3 concrete cement bags are 7.82 bags M25 grade concrete and w/c ratio .45

Is This Answer Correct ?    0 Yes 2 No

how to calculate the number of cement bags required for 1m3 of work..

Answer / pradosh pradhan

FOR M20 = 1:1.5:3
CEMENT = 1/5.5*1.57=.285 CUM.

AS PER CIVIL ENGG 1 CUM CONSUME 1440KG=28.8 BAGS
SO 0.285 CUM = .285*28.8= 8.2 BAGS

Is This Answer Correct ?    3 Yes 6 No

how to calculate the number of cement bags required for 1m3 of work..

Answer / m.r.prabhu

unit weight for cement varies from 1440 to 1650 kg/m^3..one bag of cement weighing 50 kg then it varry 28.8 to 33 bags of cement according to its unit weight...

Is This Answer Correct ?    1 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

what is the procedure of plastering..?

3 Answers  


Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR

1 Answers   NICE,


Why we use sin wave only in ac not use any other form of wave?

3 Answers   L&T,


what is floating slab foundation?

0 Answers  


Which type of question ask for written test for civil diploma trainee

1 Answers   Power Grid,






Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?

0 Answers   L&T,


What is anchorage length

1 Answers   ABPL, SBDL,


what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)

0 Answers   EEP,


What is unit weight of 1st class bricks ?

1 Answers  


qube strenth in 7nth days test

11 Answers   IVRCL,


how to stop beam concrete between column

0 Answers   L&T,


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)