Answer Posted / engr.asad ali
we know that
Total wet volume of concrete = 10Cu.m
First we find dry volume
Dry volume = wet volume X 1.54
Dry volume = 10 X 1.54 = 15.4Cu.m
Determine sum of ratio = 1+4+8 = 13
And also we know that
Quantity of Sand = ration of sand X wet volume
-------------------------------
Sum of ratio
Quantity of sand = 4 X 15.4
-----------
13
Quantity of Sand = 4.738 Cu.m say 4.74Cu.m
| Is This Answer Correct ? | 71 Yes | 4 No |
Post New Answer View All Answers
how much one carpenter can doing shuttering of slab in one day
Explain moment of inertia?
How do you compute the volume of airflow?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
What do you meant by gui?
How do you compute volume of airflow?
Trapezoidal section footing calculation of Volume & its Area
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
about higyway engineering
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
explain what do you mean by the property development.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
what is escalation?how it is done?