in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
what would be compressive strength of cube for 7 days if design mix of M15
what is the projected employment outlook for this carrer?
density of crush sand & crush stone or grit powder
which grade of cement is more suitable for construction..? and why.?? what is difference between 33, 43 and 53 grade cement..?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
why hanger rods are used in beam
What is meant by End contractions
how to design a formwork for beam, how to determine the load baring capacity of the cuplock system and which is the relevant code for the same.
how to nfind out the specific gravity of sand.aggregate,water please help...
HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND.
wat is the size of fine aggregate & coarse aggregate?
Define what is quality...