in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
Any body please let me know how to prepare Method Statement for Bored Cast in situ piles.
4 Answers Colliers International,
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what is mean by reestimation?
0 Answers Ste Infrastructure Pvt Ltd,
for mortar 1:18 how much cement and sand required for 1 CM
what is the minimum cement content for rcc as per is code
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
What is the meaning of "TOR" ??
How much concrete can be made using one bag of cement?
how can we calculate the quantity of cement, sand, aggregate in any concrete mix
19. Are you a team player?
1sqm tile laying how much cement required?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)