in levelling operation
the first site on any change point is back site
the second site on any change point is fore site
the line commenses with fore sight & closes with backsight
the line comensses with back sight & closes with fore sigh
No Answer is Posted For this Question
Be the First to Post Answer
rasio for outer plaster thickness for wall
what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.
4 Answers Al Futtaim Carillion, NTPC,
Who designed the city of washington dc?
In pile foundation which kind of action are take place?
what is the safe bearing capacity of hard murum? can we consider it 50 ton?m2
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
why we need pcc?
What is alternate bid?
why does only water ads in concrete?
how much cement and sand required for 1cum rr masonry
CORRECTION Kindly furnish the relation between 7 days strength & 28 days compressive strength of Cement Concrete cubes. Can you clarify whether the relation gets altered due to various WATER-CEMENT ratios and type of cements?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)