How to calculate the quantity of cement,sand,aggregate for the area L*B*T
are 15.24 m*21.36m*0.12m in the ratio 1:2:4
can any ine explain in detail by using formulas.
Thanks in advance

Answers were Sorted based on User's Feedback



How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m..

Answer / karthik rajendren

Volume of Concrete = 15.24*21.36*.12 = 39 Cum
For 1:2:4 , Req.Cement Bag = 6.46 Bag/Cum , Sand = 0.44 Cum
, Agg =0.88 Cum.
For total Requirement,Cement = 41*6.46=264.86,Sand =
.44*41=18.04Cum,Agg=.88*41=36.08 Cum

(5% wastage's for Concrete is considered)

Is This Answer Correct ?    9 Yes 6 No

How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m..

Answer / navjeet kumar

mixed grade 1:2:4(cement:sand:aggregate)
sum=1+2+4=7
volume of concrete=15.24*21.36*0.12=39.06cum

requirment of cement=(1/7)*39.06=5.58cum
requirment of sand=(2/7)*39.06=11.16cum
requirment of aggregate=(4/7)*39.06=22.32
you can check right or wrong by =5.58+11.16+22.32=39.06cum
so right

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

function of stirrup in rcc beam & column?

2 Answers   KMDA-Kolkata Metropolitan Development Authority, TK Group,


what is the basic difference between Coloumn & Shear Wall

0 Answers  


Where are laterally loaded piles are used in practice?

2 Answers   NBCC, Simplex,


I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?

16 Answers  


how to absorb to site basic corrections? which are the important correction?

0 Answers  






how many 10mm steel are needed in 99sqft room

2 Answers  


Whr should a joint be located in a beam if the provision of a joint is unavoidable??

2 Answers   BMTC,


how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity

3 Answers  


Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR

1 Answers   NICE,


explain kn/sqm in detail.

3 Answers  


1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...

2 Answers  


How many cement sand ballast in cc 1:4:8 40mm

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)