How to calculate the quantity of cement,sand,aggregate for the area L*B*T
are 15.24 m*21.36m*0.12m in the ratio 1:2:4
can any ine explain in detail by using formulas.
Thanks in advance
Answers were Sorted based on User's Feedback
Answer / karthik rajendren
Volume of Concrete = 15.24*21.36*.12 = 39 Cum
For 1:2:4 , Req.Cement Bag = 6.46 Bag/Cum , Sand = 0.44 Cum
, Agg =0.88 Cum.
For total Requirement,Cement = 41*6.46=264.86,Sand =
.44*41=18.04Cum,Agg=.88*41=36.08 Cum
(5% wastage's for Concrete is considered)
Is This Answer Correct ? | 9 Yes | 6 No |
Answer / navjeet kumar
mixed grade 1:2:4(cement:sand:aggregate)
sum=1+2+4=7
volume of concrete=15.24*21.36*0.12=39.06cum
requirment of cement=(1/7)*39.06=5.58cum
requirment of sand=(2/7)*39.06=11.16cum
requirment of aggregate=(4/7)*39.06=22.32
you can check right or wrong by =5.58+11.16+22.32=39.06cum
so right
Is This Answer Correct ? | 1 Yes | 2 No |
function of stirrup in rcc beam & column?
2 Answers KMDA-Kolkata Metropolitan Development Authority, TK Group,
what is the basic difference between Coloumn & Shear Wall
Where are laterally loaded piles are used in practice?
I'm puting roof slab M20 Design Concrete,Twoway slab how many days wait for remooving of shuttering?
how to absorb to site basic corrections? which are the important correction?
how many 10mm steel are needed in 99sqft room
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
how to estimate plastering quantity if the given object is in circular. 12 mm thick both side 1:3 example= i have 8.15 m2 how to estimate quantity
Currently how much cost are coming in residential building per sqm with material & Labour rate in Delhi,NCR
explain kn/sqm in detail.
1)define the critical items in rcc framed G+18 bldg. as Cr Activity 1,Cr Activity 2,Cr Activity 3...etc. 2)on what logic is MSP and Primavera planning based.FS SF FF...
How many cement sand ballast in cc 1:4:8 40mm