C40/50 of concrete strength is saying that 40Mpa(by using cylinder specimen) and 50Map (by using cubic specimen), but this concrete strength is Characteristic concrete strength or target mean concrete strength?
Answer / d.kim
I believe that C40/50 is about Characteristic concrete strength and target mean concrete strength is more higher than 40map(50map).
| Is This Answer Correct ? | 1 Yes | 0 No |
how to calculate cement mortor for wet and dry mix for different ratios
how much binding wire is reqd for 1 MT
On concrete surface 1sq.ft area hacking no's of hack?
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement Required? Brick Size 9" 4.5" 3"
48 Answers Alcove Infrastructure, Anantha Infra, L&T, Microqual, Shoba Devlopers, SSC, UltraTech, Valdan, VVA Developers,
How to calculate the wall thickness of building?
1 cubic meter contains how many bricks
47 Answers Guru Tech, Krati Enterprises, L&T,
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What are your goals?
1 Answers Cisco, Flextronics, Hexaware,
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
what is the quantity out-put by Hitachi-200 breaker for breaking or how to calculate
what is anchorage? Why anchoring of reinforcing bars necessary and what are the shapes ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)