What are the methods to do a estimate.
Answer Posted / guest
long & short method & center line method
| Is This Answer Correct ? | 34 Yes | 3 No |
Post New Answer View All Answers
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
How much material will consume for following specification water tank (9*7.5*6 feet)?
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
how much of the strength comes from post-production curing
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
What is meant by engineering drawing?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What do you mean by tolerance factor of concrete ?
What is need for setting limits?
Define What is a projection line?
what is the use of water bar in water tank and is this an extra item in estimate?
Can inverted beams used in pipes during construction?
How to increase a bearing capacity of soil?
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
Why Is Propping Required For Long Structures Once The Form Work Is Removed?