What are the methods to do a estimate.
Answer Posted / guest
long & short method & center line method
| Is This Answer Correct ? | 34 Yes | 3 No |
Post New Answer View All Answers
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
What is dead load impact load live load
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
how to calibrate the RM 800
What is the tensile strength of wood?
What is the force exerted by the tacoma narrows bridge?
How to hide dimensions in autocad?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
what is project?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
What is the origin of name railway sleepers?
how to determine H- zone in a column? where it will occur?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.