What are the methods to do a estimate.
Answer Posted / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
.5Ast
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
wat would be the probable interview questions and GD topics for IOCL exam?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
What is the standard volume of pharma in cub ft
Why should pumping be not used in case of concreting works?
How do you measure water flowing through 300mm diameter pipes?
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
What is the Roll of Water Bonding under VDF road?