What are the methods to do a estimate.
Answer Posted / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
how many shuttering material required for 1000 sq.m built up area.
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
what are the challenges of being a team leader and a supervisor?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
What are new methods /technologies of pothole patching?
How many days should curing of plastering, brick work and concrete
How do we test on design and style in a software?
What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?
Which is the direction of negative angle?
What is the difference between Fe 500, Fe 500 D and Fe 515.
is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.
Which percentage of carpet area use in plot area of office building.
how to calculate the steel in 500yard
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?