What are the methods to do a estimate.
Answer Posted / suresh s sonone
1.detailed estimate
2.supplimentary estimate
3.revised estimate
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Critical Path Method is...
Define Who designed the city of Washington DC?
material used for mendrel use to bend epoxy coated rebar
what is tension column?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What are the benefits of rcc pipes over steel designed pipes?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
at what pressure ply-wood is obtained by gluing wooden sheets
what is the theoritical percentage of concrete cubes testing per day?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
what radial pressure, the NP2 class rcc pipe can sustain?
Why reinforcement done in shorter span in two way slabs
residential projects,structural.
For what purpose bedding is used under storm water drains, explain?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density