what is MIS (related to planning tools)
Answers were Sorted based on User's Feedback
Answer / sjtbehera
MIS is managment information system. this is done month
wise. it tells everything about project
| Is This Answer Correct ? | 29 Yes | 0 No |
Answer / divya
Its management information system. It as done monthly & is
obtained from the DPR(daily progress report) collection of a
month.
| Is This Answer Correct ? | 10 Yes | 3 No |
Wat is the optimum value of tensile strength of concrete after 28 days??
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
What are the methods to do a estimate.
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What is the accepted silt content in sand for concreting purpose by volume method?
standared weighs for differnt grade of concrete
what is pure bending
How to calculate the material for pile 450 mm dia & 300 mm dia with formula find Cement = ? Sand = ? Blue metal = ?
9. What have you done to improve or develop your knowledge / professional qualifications in the last year?
which type of instrument included in plumbing work?name of instrument?
why we used bricks in brickbat coba? main roll of bricks ? how it function?
3 Answers Brigade, Waskom Construction,
what is the difference between composition of ceramic & glazed tiles?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)