draw the sfd and bmd of catilever beam subjected to point load
and udl. plot graphically the difference in deflection pattern
of simply supported and cantilever beam subjected to point
load.
Answers were Sorted based on User's Feedback
Answer / sjtbehera
it cannot draw the digram here. please refer to book
Is This Answer Correct ? | 4 Yes | 4 No |
Answer / sayonti mondal
both are diagrams available in any strength of materials book.
Is This Answer Correct ? | 4 Yes | 7 No |
What is packing Factor ?
A floor has to be removed partially with block work tying floors together, can block work continue on floor that has to removed excluding demolishing works tying floor from underside of slab and top of slab demolishing floor upon completion?
calculate the quantity of water for 1:6 cement mortar
0 Answers Pratibha Industries,
How should i calculate Cutting length of haunch bar in a raft including cover?
as we take 30% of whole brick work masonry ,so how much % we take in block masonry?
my client's 10 year old building have been affected by the neighbor new building construction with out set back.Old building cantilever bldg hanged by 3". It is supported by introducing 2 rcc columns & beams.Now how to conceal the cracks?
While calculating quantity of cement required for 1 qubic meter If mix is m25 1:1:2 =4 1.52/4=0.38, 0.38x1440=547.20 kgs I know 1440 is unit weight of cement And what is 1.52 ? And some one using 1.54 and 1.53 etc... Why they are using can u explain me what is 1.52, 1.53, 1.54?
how to calculate the quantity of steel used for construction..
Can we use PPC AND PSC CEMENT FOR MIX DEIGN?
1 Answers IVRCL, Reward Constructions,
What are the problems one might face while having a Cantilever balcony?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
What do you mean by Hydraulic Piling??