Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answers were Sorted based on User's Feedback
Answer / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / bharat gurav
because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm
| Is This Answer Correct ? | 1 Yes | 4 No |
How do we determine the specific gravity of a cement?
what is MIS (related to planning tools)
how many digree of freedom in four bar chain
How to find concrete quantity for a circular column ?
How to calculate density(dry & bulk) of sand from Sp. ravity value of sand. eg. G=2.5
what is mean by tie beam?where it is used?
Difference between ton and metric ton
the capacity of water tank in liters if the diameter is 3m, and maximum height of water level as 1m.
What is ld in beams column and slab.
why steel is used in rcc columns? what is its purpose?
What is the difference between stress and strength?
what is SDLC ?and write a 'c'program for to swapping the three numbers?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)