Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / rj
so as to have a camber at the middle area.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
Why are the bolts that hold steel rails together in oval holes?
What is 1/8 on the architect ruler denotes?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
how to check and keep control on the wastage of material at site
use ofr concrete as per grade ?
which steel is better for residential building tmt steel or hysd steel
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
Describe Briefly The Various Methods Of Concrete Curing?
Why nautical mile is different from statute mile?
How can we convert weight batch to volume batch for m30 mix
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
How do you convert wind speed into force?
Whats the meanig of ,'K' VALUE in the case of soil.....
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)