Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / rj
so as to have a camber at the middle area.
| Is This Answer Correct ? | 8 Yes | 4 No |
Post New Answer View All Answers
cement and sand required for one block of size 0.23*0.15*0.46
List out the types of roofs?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
Define What is the distance between railway tracks?
what is your role of in previous company as a construction manager
Define What is the tensile strength of wood?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
what is stressing
What you understand by richter scale?
How to increase a bearing capacity of soil?
give me the rate analysis for Bituminous Macadam and SDBC
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
I am called for interview from north east power plant .so, I need some interview question which may help me.
What is command line?