Answer / senthilkumar
if we consider 1:6 ration for cement morter , the cemnt
weight will be 240 kg per m cube morter, normaly 10% volume
of morter will be consume for brickwork of volume. if 25%
means 0.250 m cube morter need for 1 m cube brick work, so
cement need for
calculation;
1:6
1/6*1440kg=240kg
if morter require=.25 m cube
=.25*240=60 kg cement required
Is This Answer Correct ? | 9 Yes | 6 No |
Answer / gopal
cement constants can be calculated if we know the ratio
cement and sand.
Is This Answer Correct ? | 1 Yes | 1 No |
how will calculate the lift load in high rise buildings
steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion
what is the basic difference between a singly reinforce section & a doubly reinforce section?
how can i come to same questions after get answer of one question from table,because if i click for one answer and after get the answer i try to come back on same questions i cant access them the questions change, it break up my link and i jummp here and there so plz tell me the way by which i can back to the same page of questions so can continoue my proper notes thanx
what is lap length?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
Calculate the quantity of concrete for the following. 2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m length.
How much cost is required for 1 Flyash Brick?
how to calculate concrete quantity from its density or details mentioned in rmc batch report.
How may kgs. of sand make one brass ?
What do mean by freeway ?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.