Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / amar kantak
FOR POURING CONCRETE
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
While doing civil foundation of machinery. How will you process for it? & We also fixing plates at top surface of foundation, then what is the procedure?
How is improve my knowledge in construction industries....
Time required for curing of wall tiles before fixing
what is the specific gravity of rubble in plum concert
whou haat goals do you have in your career
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
What is the purpose of the gap in the road on this bridge?
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
What are the different approaches in designing the floors of the service reservoirs?
Different sizes of Hollow blocks and its weight. Thanks.
How to calculate the load of partion in flat slab if we use brick?