Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / amar kantak
FOR POURING CONCRETE
| Is This Answer Correct ? | 0 Yes | 8 No |
Post New Answer View All Answers
what do you understand by M25 concrete
for G+2 residential building how much quantity of required in foundations,sub & superstructures per sq ft area
HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?
Howmuch bend to be provide for 200/600 BEEM
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
Scaffolding IS code NO.
Which is the latest version of solidsworks?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What out turn civil works
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
how to convert cement, sand aggregate quantity from M3 to kg with full description?
How many types of slabs are there & how to design it?
How to convert 20 dia bar to 16 dia bar in beam without reducing the steel weight
what are RIB slabs explain about it