Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / bharat gurav
because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
How do we calculate the power of centrifugal pump?
Soil bearing capacity formula
what is the exact dia of 8swg and 10swg gabion wire
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
How to calculate woden area in sft and Cft
What is an ice dam sock?
what is the quantity of block work required to construct a compound wall of 6" thick,and 212 lenght
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
what is shuttering co efficient?
How many cement sand ballast in cc 1:4:8 40mm
can i get hindi version of is codes based on civil engineering?
how much used soil in 1 brick of standard size?
What is meaning of tlc
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
what are the challenges of being a team leader and a supervisor?