Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
How much quantity of cement and sand required for the inlining of 610mm dia MS pipe 8.7mm thk.Inlining thickness is 10mm and CM ratio is 1:1.5.
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
how to calculate valuation for the old building?
What is the method of soil replacement test?
How you can use different dimension tools in cad? What are the different dimensions available?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Hi how r u ? hope you are fine there . Please can u tell me tha Design life of Buildings as Per ACI CODE 318-99. It will be a pleasure for me .Thanks in advance
Describe the role of independent Quantity surveyor?
satart to end steps by step process of building construction...? i want to planning theme accuretly
How to design staircase.plz tell me formula for the design the staircase.
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How are freeway bridges built?
What is oneside mat. And explain