Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
Slab quantity
I want to join bhel because
what is the proper procedure in conducting a california bearing ratio penetration test on soil on cbr machine?
What expenses counted in contingencies and how much it is in related to built-up area of the building.
What are advancements in civil engineering?
pls give me some basic informations in construction of a structure?
can you provide a link for manual design of building?
sir please send me campus placement questions in civil engineering
Dear Sir What is the Contraction joint for base Slab
psc girder detail
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
what is the service corridor?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
about higyway engineering