What is civgl engg?
Answer / mohammad qais
Civil engineering is the branch of engineering sciences, related to design, construction and maintenance of buildings, dams, bridges, tunnels, highways and other structures by using physical laws, mathematical equations and principle of mechanics.
| Is This Answer Correct ? | 25 Yes | 1 No |
what should be the strength of Concrete cube strength for 7 days, if the designed mix is M20?
12 Answers HPCL, Shrestha Civil Engineering Construction Company Pvt. Ltd, Sri Avani Projects, Tata Projects,
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
How to calculate material and labor required for 100 m2 plaster?
advantage and dis adventagesof using crusher dust insted of sand in rcc works
1cracks found in brick wall in service building, how to rectify it,with low cost ? how to find propagation of cracks (in depthwise) and arrest on that stage? Is it require to design for Expansion joint in Brick work? if so what is the required distaces?
what is diffreant between the english bond&flamish bond
Any strength is a stress but any stress is not strength
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
please briefly explain calculating or estimating steel quantity for a RCC column?
what is the types of surveying?which type of survey carrying for type of work?
What are the tests conducted on coarse aggregates ?
What tor stands for in tor steel?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)