how to calculate concrete quantity from its density or details
mentioned in rmc batch report.
how calculate the bearing from two coordinates?
0 Answers DPTL, HPPCL Himachal Pradesh Power Corporation Limited,
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
How long does it take concrete to harden?
i need the how much materials are needed for cubic feet of concrete?
how to calculate the lap bar for bor culvert ?
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
What is dead load impact load live load
0 Answers Osmani Constructions,
how to find the carpenter work per day? how many cubic feet they should be work per day?
what is the process of repair the structure in whitch reinforcement is open
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
how much tempareture are required to make liquid state of pid leed
How can find weight fosmula in kg/m for circular cylinde steel bar?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)