While casting slab at what length slab casting should be stop
Answer Posted / vikas sampat mahadik
As per my view casting can be done to any extend,only care to be taken for joints,because setting time will be different at certain distance after casting.Every casting end should left angular,later jointing compound should be applied,at beams half beams should be filled in slant,cement slurry has to be applied ,Newer end casting of slab in center, it may end distance 1/3rd from beam.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how to calculate rate analysys of 1:6 plastering 10 sq m
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
What year was the keystone power plant in Indiana County constructed?
What is meant by cartesian coordinate system?
what is total volume of ingredients used in concrete accordingly
how to stop beam concrete between column
VAT and CST ? Which benefits for buyer ? Why benefits?
Formula of area of crane hook
what is the criteria for the finalisation of pavement thickness in road project?
Design a rectangular channel.
What was asked in isro civil interview
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
What is the zero value in quantity surveying
What is command line?
why the profile of shell of natural draught cooling tower is hyperabolic.