how to calculate the number of cement bags required for 1m3
of work
Answer Posted / mujtaba
In 1 m3 concrete cement bags are 7.82 bags M25 grade concrete and w/c ratio .45
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Can compresive strength test for concrete at 1 day age possible to carry out? If yes, which IS code describes the procedure for such testing?
what are the changes in concrete pour height as per IS 456, 2009?
why development length = 50D . why not 100D
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
what is the calculation of raw material for 0.35cum of m-15
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How much cement and sand required for 9"brick wall per square metre
What should be the standard roof height like to be?
what is your role of in previous company as a construction manager
what are the layers of the national and heir aprox thickness??
Formula of area of crane hook