how to calculate the number of cement bags required for 1m3
of work
Answer Posted / mujtaba
In 1 m3 concrete cement bags are 7.82 bags M25 grade concrete and w/c ratio .45
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What are the problems one might face while having a Cantilever balcony?
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
What is an object snap mode?
In cement making,what is meaning of blend,fineness,density.
please send latest placement papers of hpcl officers trainee test. i will be very thankful to you.
Explain what are the skills required to become an architect?
important question on stones
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
Why steel rods are produced only in even dimensions?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
What is progress payment?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
I am called for interview from north east power plant .so, I need some interview question which may help me.
How to find beam R/F cutting length