Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Answer / karnam seenu
mail me at karnamseenu@gmail.com for your requirement
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the max. area can we apply the plate load test ?
What is the difference between chamfer and fillet?
which percentage is maximum in good quality cement?
what is the real de-shuttering time for rcc column,slaband wall
how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?
how much % of steel use in footing, slab, column
Difference between the setting time and hardenin time of concrete
Strength of brick?
DESIGN OF TRUSS ELEMENTS
What is the difference between lap splice length and development length of rebars?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is the tool used at construction site for measuring cement, sand and blue metal in india.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)