where lap is provided in colom?
Answers were Sorted based on User's Feedback
Answer / fazil
As per I.S. 13920 Vertical bars of Columns shall be lapped
in regular zone (Mid-height ) only
and it should be staggered i.e. not more than 50% of bar can
be lapped at one section. In
addition to that minimum clear vertical distance between
lapped bars shall be 0.25 times lap
length.
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / arunachalam subiramani
In my 20 years exp vertical member lap should be 50times dia of the bar should provided
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / waseem athar
there are two types of zone in column,
1). no lap zone
2). splice zone
the lap length is provided in splice zone of column..
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / bilal ali khan
iN ZONE A That is in between
for example
colimn dimensionj all in mm
lenght=1000
breadth=300
height=2440
so we will take lenght 1000 and take it from bottom and take it from top of bottom
left space in between is 440mm it is zone a
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / waseem athar
Lap should be provided in splice zone or mid zone of column and it should be 50 times of dia of bar.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / neelam saroj
In column Lap length should be provided at mid height only
as per IS.
and it should be staggered prperly it means not more 50% of
of bar can be lapped at one section.
=}in general practice wht i do,
lap length should be above the slab at some distace or
below the beam at certain distance.
| Is This Answer Correct ? | 0 Yes | 0 No |
what is the wet quantity of concrete?
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
what are the CAD software versions you have used?
12 Answers ERA, IES,
How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation
Deduction in length of reinforcement steel for bar bending
Steel Calculation for Footing, Beam & Columns?
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
Difference between lime, distemper and plastic emulsion?
clear cover for concrete structures as per BS
how to create our resume?
0 Answers Sunraj Construction,
How much sand for a 1000 sqft residential building ?
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)