Answer Posted / waseem athar
there are two types of zone in column,
1). no lap zone
2). splice zone
the lap length is provided in splice zone of column..
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what are RIB slabs explain about it
How high should the water tank be to provide a 60 psi at base of this water tower?
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
Define What are the materials used in building a gravity dam?
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
In block work seawalls what is the purpose of slip joints?
which red: used in roof teping, then use only cement
What is gravity flow?
natucher of concrete &type of concrete?
how to find out hard strata in bored pile when the DMC method adopted.
how much to get of BRC lapping in full yield and half yield ?
How to calculate 1 brss for RCC work
What are the alternate material for steel, Sand and aggregate
how lap length is increased with increase of Grade of steel?