As per I.S. 13920 Vertical bars of Columns shall be lapped
in regular zone (Mid-height ) only
and it should be staggered i.e. not more than 50% of bar can
be lapped at one section. In
addition to that minimum clear vertical distance between
lapped bars shall be 0.25 times lap
length.
| Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
What are the different theories of failure under static load?
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
What is command line?
how much quantity of cement,sand and water required for 1 sq feet flooring work .
How cracks in concrete can be avoided?
How to take labor charges for construction of 1cum of concrete?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What are the disadvantages while using stone dust as filler in pavements?
What are the methods of measurement? Describe it shortly
what post do you prefer to work in this company and why do you think you can serve better in such position?
What is M40 _ TOR - EQ and B.F.S
what values & beliefs have guided you in your career path
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?