Define road.
Answers were Sorted based on User's Feedback
Answer / samyak
a road is smooth paved surface which serves the safe,efficient and timeless transportation of vehicles from one destination to another
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / manan
A road is a thoroughfare, route, or way on land between two
places, which typically has been paved or otherwise improved
to allow travel by some conveyance, including a horse, cart,
or motor vehicle.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / dileep barnwal
A road is a route,or way on land of safe and efficient transportation of goods and way of good communiction.
| Is This Answer Correct ? | 0 Yes | 0 No |
how many cement use for 1cum concrete for 25Grade.
How much cement & coarse sand is used in 1 Sqm plaster for ratio 1:4 of thickness 20 mm ?
How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?
35 Answers Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,
how to workable concrete cube test M-25 design mix
What is is code for use TOR
What should be the 28 days cube strength for M-25 grade concrete?How it is connected with acceptance criteria of fck+3 as per IS 456-2000 and why?
4 Answers IVRCL, NCC, Simplex, Tata Steel Limited,
what is the wight of 4"/6" solid block?
density of crush sand & crush stone or grit powder
How high should the water tank be to provide a 60 psi at base of this water tower?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)