Need help in designing a degasser tower for 2m3/hr DM plant,
also send me the formulae used
No Answer is Posted For this Question
Be the First to Post Answer
define prestressing? compare prestressing with post tensioning?
What is the zero value in quantity surveying
WAP to print 1) 1 1 1 1 1 1 1 1 1 1 2) 1 2 3 4 5 6 7 8 9 10
how to placeing reinforcement in slab?
how we calculate the vol.of wet concrete..?
what is difference between fluidity and workability also how palsticizer works
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
Define What materials were used to build the Golden Gate Bridge?
What is the distance between railway tracks?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.